Seal the indent with roofing caulking so the counter flashing hangs securely.
Stucco counter flashing roof.
Sill pan for nail flange windows 2020 detail.
Check out our recommended tools right here.
Overlap between the counterflashing and step flashing is not identified figure 9.
Stucco roof flashing installation if you ll be working on the roof use roofing felt to cover the area where you ll be adding flashing.
In this case it is necessary to put on a counter flashing first stucco next overlapping the counter flashing with stucco then put on the finished roof.
3 the counterflashing terminates without a hemmed drip edge.
Insert the counter flashing to the indent.
And 4 the minimum 2 in.
Examples of roofs that can t be walked on are.
Then add a layer of asphalt cement to the area where you will attach the flashing.
2 the counterflashing is depicted to be installed vertically in contact with the step flashing without a capillary break.
1 the flashing is depicted to be inserted into a horizontal reglet not sloped.
Wall to roof deck flashing 2020 detail.
The flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas.
Control joint at floor line 2016 detail.
The flashing extends up the wall at least 4.
Kick out flashing for stucco 2019 detail.
Flashing a nail flange window 2018 rev detail.
Lay 2x4 blocks on the roof to set a consistent height for the weep screed flashing.
Weep screed for stucco 2020 detail.
Cantilevered deck joist stucco 2020 detail.
Be sure to overlap the old felt with the new felt by a foot and secure it with nails.
Use roofing cement to secure the counter flashing to the base flashing and the chimney.
Be sure that it hangs so that it overlaps with the base flashing by at least 2 inches.
Flashing joints are lapped 6 in the direction of water flow.
Slip the wall leg of the weep screed behind the existing paper.